NKT delivers ultra-long cables for German SuedLink river crossing
NKT delivered specially engineered extra-long HVDC power cable sections to TenneT Germany for the SuedLink project. Each section exceeds five kilometers, eliminating the need for joints inside the tunnel beneath the River Elbe and enhancing long-term reliability of this critical transmission line segment.